Performance analysis and results

Performance analysis and results

Motronic’s Webinar analysing the operation and results obtained with our equipment

Last May, Motronic presented a Webinar on the operation of our equipment installed in the CELSA 4 rolling mill of Compañia Española de Laminación SA.

The graph shows the period before connection of the equipment, the charging period and the period after connection.

The result of the savings obtained is a reduction of 8.4%

 

No Comments

Sorry, the comment form is closed at this time.